Skip to Content
Streetsblog California home
Streetsblog California home
Log In
LA Metro

Metro and L.A. Keep Widening Streets at Transit Stations: Regional Connector Grand Avenue Edition

Metro is spending billions of dollars to expand rail transit in Southern California. Metro's nearly completed downtown L.A. Regional Connector, a $1.8 billion 1.9-mile light rail subway, is anticipated to open this fall, or maybe early 2023. Construction is so far along that Metro is sharing its plans for how the agency will "restore" streets around some stations.

Below is Metro's plan for the area around the Grand Avenue Station - located directly behind the Broad Museum and connected to it via a new pedestrian bridge.

Metro's street restoration plan for the DTLA Regional Connector
Metro's street restoration plan for the DTLA Regional Connector. In the middle of the image (immediately left of the station), 2nd Place is shown with five [or six?] car lanes.
false

While a lot of Metro's "civil improvements" around stations (mostly street widening and repaving, but also some sidewalks) are termed "restorations," Metro at least calls this one a "reconfiguration." And it's a step in the wrong direction.

Immediately south of the station, 2nd Place used to carry four lanes of car traffic. (2nd Place is a block-long street between Hope Street and Flower Street.)

2nd Place in 2014 - in front of the future Grand Avenue Station
Four-lane wide Second Place in 2014 - in front of the future Grand Avenue Station.
false

Metro's plan shows that 2nd Place will be widened to five lanes of car traffic.

Correction 9/12: A commenter noted that Metro's plan shows six lanes. Metro shows Second Place as six lanes wide; it is unclear if the sixth lane is a travel lane or a striped median.

This sort of street widening at Metro Stations is not uncommon; it already happened at many many stations along Metro's Blue, Red, Purple and Expo Lines. And it's not entirely Metro's fault.

The city of L.A. has lots of street widening embedded in its city plans, including its supposedly multi-modal Mobility Plan. Street widening seems the one part of the city's Mobility Plan that actually gets implemented during construction. In 2009, L.A. adopted its Downtown Street Standards plan, which was supposed to end road widening downtown (and largely did), but 2nd Place (and a few other Regional Connector street widenings) somehow slipped through.

There are lots of reasons to oppose road widening - but mainly it encourages more and faster driving, making streets unsafe - especially for folks on foot. Adding more road space drives up Metro project costs... and drives down Metro ridership by making the areas around stations wretched hot places - less walkable and bikeable, and blighted by excessive car traffic.

Why not just close this one short block of 2nd Place? It has been closed for a half-decade's worth of subway construction.

Why not add protected bikeways instead of more car lanes - for a first/last mile connection to the station?

Metro and L.A. City Councilmember Kevin de León balked at adding more bikeways on these newly widened, newly restored Regional Connector construction streets. Apparently drivers need these five lanes on Second Place more than cyclists need a single lane.

Again and again, Metro and L.A. are prioritizing drivers over transit riders, pedestrians, and cyclists - even as part of a mutli-billion dollar mega-projects.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Metro and Caltrans Expect to Complete Torrance 405 Freeway Widening Project Next Month

Metro and Caltrans are adding nearly two miles of new auxiliary freeway lanes, a new on-ramp, and widening adjacent streets including Crenshaw Boulevard and 182nd Street

July 22, 2024

Philadelphia Demands More Than ‘Flex-Post’ Protected Bike Lanes After Motorist Kills Cyclist

Pediatric oncologist Barbara Friedes was struck while biking on a "protected" path. Advocates argue that flex posts should be replaced with something far better.

July 22, 2024

Monday’s Headlines

Caltrain's electric trains to start limited weekend service soon; San Diego gets "tap-to-pay"; SF drivers demand "respect"; More

July 22, 2024

Advocates Share What It Takes to Fight Highway Expansions in Court 

What does it take to sue your state DOT? Time, money, the right partners, and a little creativity, a recent survey of activists found.

July 19, 2024

Friday Video: Paris Does it Again

Come for the bike-friendly streets, but stay for adopt-a-tree program and all the car-free school roadways.

July 19, 2024
See all posts