Skip to Content
Streetsblog California home
Streetsblog California home
Log In

'Amtrak Joe' Biden is President. The Democrats control the legislatureThe new DOT Secretary, Pete Buttigieg, said that "We’ve been asked to settle for less in this country, and I just don’t know why people in other countries ought to have better train service and more investment in high-speed train service than Americans do,” in a recent television interview.

And on Tuesday the acting Federal Railroad Administration chief, Amit Bose, specifically praised California's HSR project as worthy of further funding:

America has a chance to lead the world once more through innovation in infrastructure--connecting our communities, creating good jobs, addressing climate change and ensuring equity. Passenger rail development, including world-class high-speed rail, can and must be a part of our strategy to accomplish these goals. As in many other arenas, California has taken the lead nationally to advance high-speed rail, starting an economically transformative project in the Central Valley and assuming the challenges that come with that leadership. The U.S. Department of Transportation looks forward to partnering with California as it leads the way to build back better.

Over 100 miles of super-straight right-of-way with bridges, berms, viaducts, grade separations, drainage, and road realignment are underway for the HSR spine in the Central Valley. Planning documents are getting completed so that Biden's stimulus funds will go directly to finishing the project and bringing it to the Bay Area, Los Angeles, and beyond. The 2020/2021 election was a clear turning point the HSR project needed to catapult it towards building out the full system.

The Poso Creek viaduct--like all of these HSR structures, it is built for two tracks, not one. Photo: CAHSRA
The Poso Creek viaduct--like all of these HSR structures, it is built for two tracks, not one. Photo: CAHSRA
false

Against that reality, the Los Angeles Times's now-freelance reporter on the HSR beat, Ralph Vartabedian, continues to frame the project as basically D.O.A., writing Wednesday that the construction authority will build "...a single track in [the] Central Valley" rather than the planned two tracks on the Bakersfield-to-Merced route.

That statement isn't just out of sync with recent news: it's patently false.

"We absolutely intend to build two tracks," said Boris Lipkin, a director on the project.

As with most of Vartabedian's anti-rail propaganda, the one-track claim parallels a shard of truth--just enough to make it seem plausible to the uninitiated. On page 44 of the recently released business plan, it says that as part of its bidding process the authority wants contractors to look at completing one of the two planned parallel tracks before the other, so they can run some trains before both are finished.

Here is the core of the actual statement in its original bureaucratese:

Key to this proof-of-concept and initial operations are passing tracks for trains operating interim service. In addition, track elements necessary for ultimate expanded dual track operation would be constructed, thus minimizing future service interruptions and costs. This will allow the Authority to phase track implementation throughout the Central Valley in a way that meets cash flow and funding availability.

As seen in the photos below and above, everything the authority is building is more than wide enough for two tracks. Furthermore, the new business plan was written before the outcome of the 2020 election was determined in the Senate. So it was just sensible to explore all possible contingencies to get some trains running as soon as possible--and some ticket revenue flowing--if anti-rail Republicans held onto power. "It's not the ultimate vision, we will certainly need two tracks," said Lipkin.

Construction of the Hanford viaduct. All bridges, viaducts--the entire ROW is being built for two tracks, despite the LA Times nonsensical reporting. Photo: CAHSRA
Construction of the Hanford viaduct. All bridges, viaducts--the entire ROW is being built for two tracks, despite the LA Times nonsensical reporting. Photo: CAHSRA
false

And now, given the shift in power in Washington, the idea of finishing one track first is basically moot.

Perhaps so is the once-great LA Times and its mudslinging, anti-rail flack masquerading as a reporter.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Covina to Begin Construction on Recreation Village

The new facility will be next to the Metrolink station and include a variety of opportunities for fitness and amusement

July 26, 2024

Talking Headways Podcast: Have Cities Run Out of Land?

Chris Redfearn of USC and Anthony Orlando of Cal Poly Pomona on why "pro-business" Texas housing markets are catching up to "pro-regulation" California and what it might mean for future city growth.

July 26, 2024

Friday’s Headlines

Oakland identifies sites for speed camera pilot; E-bike tariffs conflict with US climate policy; Pollution spikes around warehouses, shipping hubs; More

July 26, 2024

What the Heck is Going on with the State E-bike Incentive Program?

The program's launch has been delayed for two years, and currently "there is no specific timeline" for it. Plus the administrator, Pedal Ahead, is getting dragged, but details are vague

July 26, 2024

The Paris Plan for Olympic Traffic? Build More Bike Lanes

A push to make Paris fully bikable for the Olympics is already paying dividends long before the opening ceremonies.

July 25, 2024
See all posts