Skip to Content
Streetsblog California home
Streetsblog California home
Log In
LA Metro

Metro Board Approves Link US Union Station Run-Through Tracks

At its Meeting today, the Metro board approved environmental studies for the Link US Union Station run-through tracks project. Link US will improve the overall efficiency of Union Station, especially for Metrolink, Amtrak, and planned California High-Speed Rail. The final design, as detailed in this earlier SBLA post, includes an expanded central concourse hallway and eliminated loop tracks. These modifications reduced project costs while prioritizing rider convenience while transferring between trains.

Comparison of three concourse concepts considered for Link US
Comparison of three concourse concepts considered for Link US. Option 1 is the final design selected. (click to enlarge image)
false

Mostly due to time constraints, Link US approvals sailed through both committee and full board unanimously with no presentations or discussions. The board action officially certified the Link US Final Environmental Impact Report (FEIR).

The overall Link US project is estimated to cost roughly $2.3 billion. Metro already has $950 million to fund the initial Link US phase, essentially just building a new elevated track structure over the 101 Freeway. An unfunded second phase – costing nearly $2 billion – would make extensive changes to Union Station itself, including widening the concourse hallway, raising the platforms, expanding the northern "throat tracks," etc.

Potential 101 Freeway bridge concepts for Union Station run-through tracks - renderings via Metro
Potential 101 Freeway bridge concepts for Union Station run-through tracks - renderings via Metro
false

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Report: Half of Uber, Lyft Trips Replace More Sustainable Options

Researchers at UC Davis have found that more than half of ride-hail trips in California replace walking, biking, carpooling, and public transit trips, or are trips that otherwise wouldn't happen. They have ideas to make it more sustainable.

August 30, 2024

In October, Santa Monica Will Lower Speed Limits on 29 Streets – and Raise it on One

Based on Council procedures, the changes require a second vote that should occur at the September 10 meeting, with changes going into effect 30 days later.

August 30, 2024

Roscoe Blvd Bus-Priority Lanes Are Open

At 10.4 miles (20.8 lane-miles) Roscoe Boulevard now has the most bus-only lane mileage of any street in Southern California

August 30, 2024

Media Critique: Labor Day Traffic Coverage Ignores Trains

Recent coverage of the Labor Day weekend travel crush fails to mention rail services

August 30, 2024
See all posts