Skip to content
Sponsored

Thanks to our advertising sponsor

Eyes on the Street: Santa Monica’s New Michigan Avenue Greenway Extension

The 1/8-mile-long Michigan Avenue Neighborhood Greenway (MANGo) extension includes two short bike/walk paths and one block of two-way protected bike lanes
Eyes on the Street: Santa Monica’s New Michigan Avenue Greenway Extension

The city of Santa Monica’s 20th Street Bike and Pedestrian Improvements Project opened about a month ago. Today, Streetsblog got a chance to bike there and take photos.

City map of 20th Street bike/ped improvements project

The 1/8-mile-long Z-shaped facility is an extension of the city’s Michigan Avenue Neighborhood Greenway, called MANGo. The project includes two short bike/walk paths and one block of two-way protected bike lanes.

The new bike/walk facility is smart and strategic, aptly extending an existing low stress bikeway across a barrier – the 10 Freeway. The design and execution are very good, though the proximity to the freeway and its off-ramps means that the area remains full of car traffic. It can be a pretty loud place, especially for people on foot or on bike waiting for the light to cross 20th Street.

Below is a photo tour of the project from west to east.

The west entrance to the 20th Street bikeway/walkway at the end of Michigan Avenue
At this end the city improved a very basic walkway, adding a short bike path (about 70 feet long), lighting and landscaping. The asphalt two-way bike path runs alongside a concrete walkway.
The facility narrows near 20th, where cyclists and pedestrians briefly share the sidewalk
Pedestrians and cyclists cross 20th at a signalized crosswalk. It’s difficult to make out in this photo, but the green light near the center is a bike signal.
The facility includes a block of protected two-way bike lanes along 20th, with concrete curbs at each end
The protected bike lanes along 20th Street cross the 10 Freeway
Immediately north of the freeway, the facility turns east
The east end of the facility is a roughly 320-foot-long bike/walk path running between Crossroads schools and the 10 Freeway
The bikeway/walkway currently ends at Michigan and 21st Street, about half a mile ride or walk to the E Line Bergamot/26th Station

Find more MANGo project information at SBLA coverage last November and in April.

The post Eyes on the Street: Santa Monica’s New Michigan Avenue Greenway Extension appeared first on Streetsblog Los Angeles.

Streetsblog has migrated to a new comment system. New commenters can register directly in the comments section of any article. Returning commenters: your previous comments and display name have been preserved, but you'll need to reclaim your account by clicking "Forgot your password?" on the sign-in form, entering your email, and following the verification link to set a new password — this is required because passwords could not be carried over during the migration. For questions, contact tips@streetsblog.org.

More from Streetsblog California

Tuesday’s Headlines

April 28, 2026

Are U.S. Cities Ready for the Robo-Taxi Revolution?

April 27, 2026

Streetsblog Reviews Last Weeks California Bike Summit, Part 1: Advice on Living with Caltrans

April 27, 2026

San Francisco Celebrates One Year of Sunset Dunes

April 27, 2026
See all posts