Skip to Content
Streetsblog California home
Streetsblog California home
Log In

The city of Pasadena is making progress on a vision to calm traffic on four corridors in the City.

The city is looking to implement bike boulevards on El Molino, Wilson, Sierra Bonita, and Craig Avenues. An update on the study, also called the Greenway Traffic Analysis and Implementation, was presented to the Pasadena's Transportation Advisory Commission on April 22.

The improvements on El Molino Avenue would stretch to the north and south borders of the city; Wilson Avenue would stretch from Washington Boulevard to near the southern border at Arden Road; Sierra Bonita Avenue would go from Washington Boulevard to Colorado Boulevard; and Craig Avenue from Casa Grande Street to the city's southern border at Del Mar Boulevard. These areas being considered for neighborhood greenways/bike boulevards could receive traffic calming, lower speeds, and intersection improvements to facilitate easier crossings.

Planning for these corridors has been in the works since as early as 2015 when the city released its Bicycle Transportation Plan, which had the goal to build a bikeway network that would put a bikeway within a quarter mile of every residential neighborhood. A feasibility study included in the BTAP identified ten corridors — including El Molino, Wilson, Sierra Bonita, and Craig Avenues — that could be a good fit for protected bike lanes, buffered bike lanes, and bike boulevards.

The study of El Molino, Wilson, Sierra Bonita, and Craig Avenues started in 2019 when consultants KOA were contracted to analyze the impacts, feasibility, benefit, and cost of their bike boulevard projects. Some of the infrastructure improvements proposed include bulb outs, quick build medians, bike crossing at intersections, flashing light beacons, roundabouts, bicycle boxes for turning, and curb extensions.

El Molina avenue improvements include installing quick-build medians and offset edge islands, which seem similar to bulb outs since they pinch the road narrowing it. Image: Pasadena Department of Transportation
El Molino Avenue improvements include installing quick-build medians and offset edge islands, which seem similar to bulb outs since they pinch the road narrowing it. Image: Pasadena Department of Transportation
false
Wilson Avenue could see traffic calming islands, no parking red paint on some curbs, green dashed paint to show where bikes may cross at intersections, yellow flashing beacons and a paint buffered bike lane on the I-210 overcrossing. Image: Pasadena Department of Transportation
Wilson Avenue could see traffic calming islands, no parking red paint on some curbs, green dashed paint to show where bikes may cross at intersections, yellow flashing beacons and a paint buffered bike lane on the I-210 overcrossing. Image: Pasadena Department of Transportation
false
Roundabouts are proposed at Sierra Bonita Avenue and Loma Vista and Paloma Street intersections. Image: Pasadena Department of Transportation
Roundabouts are proposed at Sierra Bonita Avenue and Loma Vista and Paloma Street intersections. Image: Pasadena Department of Transportation
false
Craig Avenue could see flashing yellow left turn arrows, bike turn boxes, paint striped buffered bike lanes, and curb extensions, and traffic circles. Image: Pasadena Department of Transportation
Craig Avenue could see flashing yellow left turn arrows, bike turn boxes, paint striped buffered bike lanes, and curb extensions, and traffic circles. Image: Pasadena Department of Transportation
false

This study also is developing an implementation plan which would rank each corridor by how well it would reduce crashes, how the corridor would fill out the bicycle network, its ability to access open space, schools and existing bikeways; its benefits to areas burdened by unhealthy environments; cost; and impacts to traffic and parking.

A summary of Pasadena's Greenways Traffic Analysis and Implementation Plan project rankings and rough cost estimates. Image: Pasadena Department of Transportation
A summary of Pasadena's Greenways Traffic Analysis and Implementation Plan project rankings and rough cost estimates. Image: Pasadena Department of Transportation
false

Pasadena's department of transportation staff expect to share findings of the study with the public this coming summer. From there, staff will be getting feedback on the findings, the project concepts, and refine the work to be eventually developed as future capital improvement projects.

SBLA San Gabriel Valley coverage, including this article and SGV Connect, is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the new Gold Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit Foothill Transit. “Foothill Transit. Going Good Places.”

Sign-up for our SGV Connect Newsletter, coming to your inbox on Fridays.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Monday’s Headlines

Another study shows health benefits of biking far outweigh risks; Santa Rosa loses a freeway plan, gains a park; Take transit to the Rose Parade; More

December 23, 2024

New Metro Subway Railcars Started Service Today

Streetsblog got a special preview ride today. Have you ridden Metro's new "HR4000" heavy rail cars yet?

December 23, 2024

Letter to Readers: Happy Holidays and Thoughts on the Year’s Takeaways

2024 will be remembered as a seminal year for San Francisco streets

December 23, 2024

Streetsblog Year in Review: The Biggest Sustainable Transport News of 2024

It was a busy year in the movement to end car dependency — and there's a lot more to come.

December 23, 2024

Friday’s Headlines

New, wider sidewalks in SF's Tenderloin; Environmental groups sue CARB over biofuels; Biden sets national climate goals; More

December 20, 2024
See all posts