Skip to Content
Streetsblog California home
Streetsblog California home
Log In

Note: Metropolitan Shuttle, a leader in bus shuttle rentals, regularly sponsors coverage on Streetsblog San Francisco and Streetsblog Los Angeles. Unless noted in the story, Metropolitan Shuttle is not consulted for the content or editorial direction of the sponsored content.

It took multiple people-protected bike lane protests, intense pressure on politicians, some serious bike crashes, and continued pressure from the San Francisco Bicycle Coalition. On Dec. 4, the SFMTA board voted to build protected bike lanes on Valencia after receiving 500 letters and emails in support and hearing from over forty speakers.

And, finally, at long last, the lanes are under construction.

As seen in the lead image and below, San Francisco Public Works was busy pouring concrete over the winter break for a "...new school boarding islands (with protective railing) at San Francisco Friends School and Millennium School," wrote Ben Jose, SFMTA spokesman, in an email to Streetsblog. "The islands will provide students and parents with safe, designated areas for pick-up and drop-off." The new bike lane will run between the islands and the sidewalk.

Another view of the work
Another view of the work
false

More from the SFMTA website:

In partnership with Mayor Breed and her directive, the SFMTA will pilot and implement parking-protected bike lanes on Valencia Street from Market to 15th streets. After implementation, the project team will evaluate the design to help inform the long-term, corridor-wide project. Additional outreach and community conversations will be held in spring and summer 2019 to determine a preferred bikeway design alternative(s) for the entire corridor.

As Streetsblog readers know, Valencia's current striped bike lane, along the parked cars, is continually blocked by Ubers, Lyfts, and other vehicles. A short protected bike lane project was installed in 2017 for one block on the southern end, between Cesar Chavez and Duncan. That seems to be working, albeit on such a short length of the street it hardly matters. But the hope of advocates is that with an anchor on the southern end, and a significant project on the northern end, pressure will hold to add protected bike lanes for the entire length of the corridor.

And that can't come soon enough. There were "268 reported collisions between Market and Mission streets from 2012 to 2016, [and] 30 percent of the collisions occurred between Market and 15th streets," according to the SFMTA. These collisions, reports the agency, resulted in at least 65 injuries and one fatality.

"Our vision for Valencia Street is a corridor-wide transformation with a street design that keeps Uber and Lyft drivers out of the bike lane," wrote SFBC's Kristen Leckie in a blog post.

Some advocates want to dream even bigger and would like all or a significant portion of Valencia turned into a bike and pedestrian corridor, with through automobile traffic banned.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

First OC Streetcar Arrives

The $649 million 4.1-mile OC Streetcar light rail line is 92 percent complete, and now anticipated to open in spring 2026

May 8, 2025

Thursday’s Headlines

California and Trump continue to spar and more news from up and down the state.

May 8, 2025

Talking Headways Podcast: ‘Normal’ is Not Correct, Someone Died Here

After a crash, the debris is quickly cleaned up and everyone moves on (usually too quickly). But these two experts are asking us to all slow down.

May 8, 2025

Metro Names Bill Scott as Chief of Police

Chief Scott and Metro leadership emphasized that keeping Metro transit safe would require a multi-faceted approach that included the deployment of officers as well as collaboration with the community, ambassadors, and service providers. "Sometimes enforcement is the answer," Scott said. "Sometimes it's not."

May 7, 2025

State Supreme Court Reinforces Rules that Cities Must Maintain Safe Roads

When Ty Whitehead was injured in a crash caused by a pothole in Oakland, it sparked an eight-year legal battle that is still being waged.

May 7, 2025
See all posts