Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Streetsblog LA

L.A. City Councilmember O’Farrell Breaks Ground on Beverly Blvd Safety Improvements

L.A. City Councilmember Mitch O’Farrell speaking at this morning’s groundbreaking for Beverly Blvd safety improvements. All photos: Joe Linton/Streetsblog L.A.

This morning, L.A. City Councilmember Mitch O'Farrell hosted a groundbreaking event for a project that will make Beverly Boulevard safer and more pedestrian-friendly. O'Farrell was joined by community leaders and city staff from the Bureau of Public Works and the Bureau of Street Services.

Councilmember O'Farrell and community and city leadership breaking ground this morning
Councilmember O'Farrell (white shirt, center) and community and city leadership breaking ground this morning
false

O'Farrell spoke of the importance of making streets safer for walking. He enumerated some infuriating numbers, stating that the city of L.A. saw "134 pedestrian fatalities" last year and "hundreds more injuries." O'Farrell acknowledged that L.A. is the "hit-and-run capital," mentioning one particularly outrageous hit-and-run crime: in San Bernardino last night, a driver ran a red light and took the life of a woman who was eight months pregnant.

The $1.37 million Beverly Boulevard Transportation Enhancements project was funded by a grant from California's Active Transportation Program (ATP). It will upgrade pedestrian facilities along a ~2.5-mile stretch of Beverly Blvd from Koreatown's Vermont/Beverly Red Line Station to just east of Beverly's intersection with Glendale Boulevard, near downtown Los Angeles. The western portion of the project - the stretch of Beverly from Vermont Avenue to Rampart Boulevard - is on the city's Vision Zero High Injury Network of streets that experience a higher share of traffic deaths and injuries.

The project's enhancements include new curb ramps, newly-reconstructed driveways, new curb extensions, two new landscaped median islands (at Lafayette Park Place and at Occidental Boulevard), 19 new street trees, new bike racks, and continental crosswalks.

Construction is already underway and is expected to take nine months.

Construction already underway at Beverly and Vermont
Construction already underway at Beverly and Vermont
false
Earlier, L.A.'s Vision Zero program enhanced this pedestrian crossing at Beverly and Vendome, though the in-street signs have been damaged by graffiti and by cars crashing into them (note the sign on the far side of the intersection is missing)
Earlier, L.A.'s Vision Zero program enhanced this pedestrian crossing at Beverly and Vendome, though the in-street signs have been damaged by graffiti and by cars crashing into them (note the sign on the far side of the intersection is missing)
false

These safety improvements are rather basic. They will result in a safer and better street for people walking - as well as for people using wheelchairs, strollers, and grocery carts. On their own, they are unlikely to transform this car-centric stroad-like stretch into a highly walkable place. The improvements are modest steps in the right direction, with the potential to catalyze more walking with fewer deaths and injuries.

In a time of backlash against safety improvements, when the city is undoing traffic safety projects on the Westside and putting planned safety improvements on hold, including on nearby Temple Street and in South L.A., it is good that Beverly's worthwhile upgrades are on the way.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

2026 Could Be the Year Everything Changes for California High-Speed Rail

What's being built. The financial plans. Everything short of the route could be different a year from now.

November 13, 2025

Why the $65M Studebaker Road Transformation Project Is important for Long Beach

When construction wraps in late 2026, the Studebaker corridor will no longer be a line of separation but a living connector.

November 13, 2025

Thursday’s Headlines

Just a reminder, SBCAL will not be publishing tomorrow.

November 13, 2025

LA Scrapes Grassroots Koreatown Crosswalks, Plans To Replace

The city will replace guerilla crosswalks with an interim traffic circle and new crosswalks. The delayed permanent traffic circle is expected to installed next year.

November 12, 2025

Call to Action: Tell Supervisor Beya Alcaraz About Your Love for Sunset Dunes

Advocates want to make sure the new District 4 Supervisor knows where you stand.

November 12, 2025
See all posts