Joe Linton
Connect
Metro Ridership Snapshot Suggests Added Service, Bus Lanes, and Walk/Bike Projects Increase Riders
Overall Metro ridership grew 7.5 percent year-over-year, but some rail and bus lines grew 10-20+ percent. SBLA explores factors that influenced outsized system-leading ridership increases.
Eyes on the Street: Culver City’s Farragut Walkway Revamp
The ~200 foot long walkway - also used by cyclists - connects two residential streets about a half-mile south of downtown Culver City
Metro Rider Updates: C/K Lines, Bus Lane Cameras, TAP-to-Exit, and Cell Service
Cameras on Metro buses are now enforcing bus lanes! Metro K Line Aviation/Century Station opens this Sunday, with changed C and K Line operations. TAP-to-exit and cell phone reception are expanding.
Metro Breaks Ground on Early Phase of Southeast Gateway Light Rail Construction
The initial $7 billion SE Gateway Line segment will extend 14.5 miles from Artesia to the South L.A. community of Florence, with connections to the Metro A and C Lines
Eyes on the Street: New San Pedro Front Street Walk/Bike Path
The half mile long landscaped multi-use path extends from Regan Street (essentially under the Vincent Thomas Bridge) to just west of Pacific Avenue
CicLAvia Heart of L.A. 2024 – Open Thread
Sunday's Heart of L.A. event was the 56th iteration of Los Angeles' popular open streets festival, CicLAvia
Eyes on the Street: Santa Monica’s New Michigan Avenue Greenway Extension
The 1/8-mile-long Michigan Avenue Neighborhood Greenway (MANGo) extension includes two short bike/walk paths and one block of two-way protected bike lanes