This morning, San Bernardino County leaders celebrated a ribbon-cutting for new Arrow train service between San Bernardino and Redlands. Metrolink will operate service on the nine-mile-long line starting Monday.
Map of Arrow Redland Passenger Rail Project - via fact sheetfalse
Arrow will operate just over twenty trips per day between Downtown San Bernardino and Redlands University. There is also one express train daily between the Downtown Redlands and L.A. Union Station (per the current schedule it departs Redlands at 5:58 a.m., then from Union Station at 5:26 p.m. - check for latest schedule at Metrolink website). At Downtown San Bernardino, Arrow riders can easily transfer to Metrolink's San Bernardino and Inland Empire-Orange County Lines, as well as San Bernardino County Transportation Authority's (SBCTA) sbX Bus Rapid Transit line.
The new train connects to job centers, including Esri, civic centers in Redlands and San Bernardino, and to the University of Redlands.
San Bernardino County Supervisor Dawn Rowe presided over the Arrow ribbon-cutting ceremonyfalse
Officials cut the ceremonial ribbon for new Arrow train service. Holding the big scissors is U.S. Representative Pete Aguilarfalse
Arrow service operates with "DMU" (diesel multiple unit) trains. The engine is in the middle of the train, with passenger space on both ends. The middle engine unit can be swapped out to run on various energy sources - diesel, catenary electric, etc. Initial Arrow operations will be diesel, with plans to upgrade to zero-emission energy in 2024.false
After speakers and ribbon cutting, the public lined up to check out the interior of the new Arrow train cars.false
Interiors have numerous contemporary train features (see below). The upper middle of the photo shows the corridor through the middle engine car.false
Arrow trains feature level boarding, wheelchair spaces, bike parking, luggage racks, USB chargers, and morefalse
The downtown Redlands Station features two platforms: one higher (level-boarding) for Arrow, and one for standard Metrolink trains. On the right is a new parking structure for Arrow/Metrolink riders.false
Arrow utilizes existing rail right-of-way, most of it is single-trackedfalse
Historic downtown Redlands station with the brand new Arrow trainfalse
Chris Redfearn of USC and Anthony Orlando of Cal Poly Pomona on why "pro-business" Texas housing markets are catching up to "pro-regulation" California and what it might mean for future city growth.
Oakland identifies sites for speed camera pilot; E-bike tariffs conflict with US climate policy; Pollution spikes around warehouses, shipping hubs; More
The program's launch has been delayed for two years, and currently "there is no specific timeline" for it. Plus the administrator, Pedal Ahead, is getting dragged, but details are vague