Skip to Content
Streetsblog California home
Streetsblog California home
Log In

Go Human is a community outreach and advertising campaign with the goals of reducing traffic collisions in Southern California and encouraging people to walk and bike more. Developed by the Southern California Association of Governments, Go Human implements open streets and pop up events throughout the Southern California region.

Recently in Riverside, CA, the Go Human campaign employed Street Plans & Alta Planning to help install temporary tactical urban installations at two intersections and develop and implement a 3-week pilot for a pedestrian scramble on Mission Inn Avenue and Market Street, considered to be the gateway to the city of Riverside. These efforts are a fun way to help educate and inform city residents while gathering feedback both visual (from city engineers) and written (from users) at kiosks set up by Go Human.  The quick feedback in our Streetfilm shows people seem to love the idea!

Over the years, also known as the Barnes Dance and Diagonal Crosswalks, the NYC Council recently passed legislation that would require having the NYC Dept. of Transportation bring 25 such treatments to high-crash, dangerous intersections in the city.  This is great news.

But let me add this: although Pedestrian Scrambles are an effective implementation in very complicated, high volume places, Leading Pedestrian Intervals (LPIs) - where pedestrians get a 5 to 7 second head start on traffic - are also extremely effective and can be done with a flip of the switch.  NYC DOT has installed many of these in my neighborhood in the past few years.

All in all, the more tools to slow cars and tame the streets, the better.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

The Week in Short Videos

High-Speed Rail, an L.A. Metro smart bike locker how-to, and a push for a new pedestrian plaza in L.A.'s Koreatown

November 15, 2025

2026 Could Be the Year Everything Changes for California High-Speed Rail

What's being built. The financial plans. Everything short of the route could be different a year from now.

November 13, 2025

Why the $65M Studebaker Road Transformation Project Is important for Long Beach

When construction wraps in late 2026, the Studebaker corridor will no longer be a line of separation but a living connector.

November 13, 2025

Thursday’s Headlines

Just a reminder, SBCAL will not be publishing tomorrow.

November 13, 2025

LA Scrapes Grassroots Koreatown Crosswalks, Plans To Replace

The city will replace guerilla crosswalks with an interim traffic circle and new crosswalks. The delayed permanent traffic circle is expected to installed next year.

November 12, 2025
See all posts