Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Streetsblog USA

Seattle’s New Park-and-Rides Cost a Fortune But Won’t Move Many People

Seattle area voters will vote this November on a $53 billion transit expansion package. But along with new light rail lines stretching across the region, Seattle will also be getting a publicly owned parking empire.

In total, the plan calls for $661 million in spending on parking at transit stations. At an astounding $80,000 per stall, that will fund 8,300 parking spots.

Zach Shaner at Seattle Transit Blog notes that with 18,000 parking spaces already operated or planned by Sound Transit, the system will have about 26,000 stalls when complete. He set out to visualize all that parking and created this excellent map:

Seattle's $53 billion light rail expansion plan also calls for a new ? of parking. Map: Zach Shaner, Seattle Transit Blog.
So many resources devoted to parking spaces that will serve such a small fraction of potential transit ridership. Map: Zach Shaner/Seattle Transit Blog
false

Despite all the space and money these parking spaces will consume, Shaner writes, they won't serve a large share of light rail riders, because "parking fundamentally can't scale":

The system we’d get would be similar to DC Metro in many respects, fully tunneled and zero parking in the urban core, fully traffic-separated, and with both poor land use and gobs of parking on the exurban periphery. Like DC Metro, there would be the occasional urban-ish station, such as Downtown Redmond. Unlike DC, we’d have historic cities (Everett/Tacoma) anchoring the ends of the lines. The scope of our Everett-Tacoma spine would be unprecedented, equal to straightening out DC’s Red Line and then doubling its length.

The dual nature of our system is clear from its parking provision, with a genuinely urban subway that becomes interurban, parking-fed commuter rail on the periphery. From a current or transitional land use perspective, this makes some sense. But it bodes poorly for the suburban TOD that is the main hope for filling the suburban trains off-peak.

Lastly, this further shows how parking fundamentally can’t scale. The 26,000 total parking stalls are less than just the ridership growth from ULink’s two stations. If every stall were taken and assuming 1.5 people per car, the resulting 40,000 people would be less than 10% of projected ridership. Those 40,000 riders would only fill 50 crushloaded 4-car trains, which at 6-minute headways on 3 lines would mean roughly 1.5 hours worth of capacity every morning per line, with lots still full as early as 7:30 a.m.

Elsewhere on the Network today: Rebuilding Place in the Urban Space notes the failure of the Republican Party to develop an urban agenda. And Columbus Underground reports that transit advocates are pleading with city leaders not to dismiss transit in favor of self-driving cars.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Op/Ed: The Cameras We Fear and the Speed We Ignore

We can hold two ideas at once. Surveillance systems that accumulate unchecked power deserve opposition. Tools that are narrow, transparent, and built with statutory guardrails deserve evaluation on their merits.

February 27, 2026

The Week in Short Video

Fresno ballot measures, wild armadillos, gas tax holidays, and four miles of mid-city Los Angeles subway opening in May

February 27, 2026

Friday’s Headlines

We wanted e-bike incentives. They offered EV rebates. But maybe we'll get nothing.

February 27, 2026

Americans Demand Congress Fund Active Transportation In Next Infrastructure Bill — And Not Just The Bike/Walk Advocates

A "back to basics" surface transportation bill — as Republicans are seeking — would be devastating for road safety and small businesses.

February 26, 2026

“Stop Super Speeders Act” Takes Aim at California’s Most Dangerous Drivers

Bill would stop super speeders after they're caught and hopefully before they kill.

February 26, 2026

SGV Bus Rapid Transit Gets Another $3.9M for Study and Design

Early improvements combine for about 14 miles of continuous bus lanes, expected to be installed in advance of the 2028 Olympic games.

February 26, 2026
See all posts