Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Planning

Draft Pasadena Pedestrian Plan Public Feedback Period Ends

The city of Pasadena wrapped up its community feedback period on Wednesday for its draft pedestrian master plan.

Pasadena Walks!, the city’s 2022 pedestrian plan, would prioritize and guide investments to create a safer and more walkable Pasadena. The plan identifies 10 high priority corridors, multiple high priority crossings and multiple secondary corridors.

Priority corridors include:

    • Allen Avenue, from the north city limit to Colorado Boulevard
    • Del Mar Boulevard, from Pasadena Avenue to the east city limit
    • Fair Oaks Avenue, from the north city limit to the south city limit
    • Foothill Boulevard, from Walnut Street to the east city limit
    • Lake Avenue, from the north city limit to Colorado Boulevard
    • Lincoln Avenue, from the north city limit to Washington Boulevard
    • Los Robles Avenue, from the north city limit to Walnut Street
    • Raymond Avenue, from Colorado Boulevard to E. Glenarm Street
    • San Gabriel Boulevard, from Maple Street to California Boulevard
    • Washington Boulevard, from Lincoln Avenue to Lake Avenue

With the public comment period ended, the plan is likely headed to city council in the coming weeks. Members of the public can still email elected officials their feedback on the plan at correspondence@cityofpasadena.net.

The Pasadena Complete Streets Coalition announced in their February newsletter a few ideas they would like to see in the soon to be considered Pasadena Pedestrian Plan.

    • Specific recommendations regarding what street improvements are to be implemented and where to implement them.
    • A clear timeline for implementing the plan in order to evaluate progress and ensure accountability.
    • Breaking up Orange Grove Blvd into two different segments and place the Orange Grove Blvd segment west of Lake Ave into the "Top 10 High Priority Corridors”.
    • Evaluate the potential of creating a dedicated funding source for pedestrian improvements.
    • Include the intersections of Washington Boulevard at Hudson Avenue and Washington Boulevard at Palm Terrace into the list of priority intersections.

The deadline to submit public comment on the draft plan was February 1, 2022, but people can still email city council, where it will eventually be addressed at a future meeting.

SBLA San Gabriel Valley coverage, including this article and SGV Connect, is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the new Gold Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit Foothill Transit. “Foothill Transit. Going Good Places.”

Sign-up for our SGV Connect Newsletter, coming to your inbox on Fridays.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Op/Ed: The Cameras We Fear and the Speed We Ignore

We can hold two ideas at once. Surveillance systems that accumulate unchecked power deserve opposition. Tools that are narrow, transparent, and built with statutory guardrails deserve evaluation on their merits.

February 27, 2026

The Week in Short Video

Fresno ballot measures, wild armadillos, gas tax holidays, and four miles of mid-city Los Angeles subway opening in May

February 27, 2026

Friday’s Headlines

We wanted e-bike incentives. They offered EV rebates. But maybe we'll get nothing.

February 27, 2026

Americans Demand Congress Fund Active Transportation In Next Infrastructure Bill — And Not Just The Bike/Walk Advocates

A "back to basics" surface transportation bill — as Republicans are seeking — would be devastating for road safety and small businesses.

February 26, 2026

“Stop Super Speeders Act” Takes Aim at California’s Most Dangerous Drivers

Bill would stop super speeders after they're caught and hopefully before they kill.

February 26, 2026

SGV Bus Rapid Transit Gets Another $3.9M for Study and Design

Early improvements combine for about 14 miles of continuous bus lanes, expected to be installed in advance of the 2028 Olympic games.

February 26, 2026
See all posts