Skip to Content
Streetsblog California home
Streetsblog California home
Log In

SGV Connect

South Pasadena to Remove Bike Lanes on Grand Avenue

The 0.6 miles of lanes are part of a batch of temporary Slow Streets installations that will mostly be removed, save for a few bits and pieces.

April 2, 2024

Alhambra City Council Approves New Bike and Walk Plan

There was a general atmosphere of support for the plan, but with key differences on the extent of facilities that might be developed

March 15, 2024

Where Does Alhambra Stand in the BRT Plan for the 60 Freeway Corridor?

The city is not quite in the 60 Freeway corridor; but there is a strong case and appetite for Bus Rapid Transit there

February 29, 2024

SGV Connect 122: Glendora

The podcast continues a tour through the San Gabriel Valley with an episode focused on the city of Glendora, known as the Heart of the Foothills.

February 28, 2024

SGV Connect 121: El Monte and South El Monte, with ActiveSGV and Libros Monte

Podcast features ActiveSGV's David Diaz on various multimodal/complete streets projects - and Pedro Gonzales on Libros Monte and Mt. SAC's El Centro: Latinx Student Program The post SGV Connect 121: El Monte and South El Monte, with ActiveSGV and Libros Monte appeared first on Streetsblog Los Angeles.

February 20, 2024

First Stretch of Rosemead Blvd Complete Street Improvements Now Open

It’s just a half mile of protected bike lane right now, but it’s slated to expand out to two miles, surrounded by a host of facilities around greater El Monte.

February 1, 2024

Turnbull Canyon Road Grade Separation Construction Underway Soon, Includes Ped/Bike Bridge

The bridges will be built over the Union Pacific tracks where many cut through for a reprieve from the area’s busy arterials The post Turnbull Canyon Road Grade Separation Construction Underway Soon, Includes Ped/Bike Bridge appeared first on Streetsblog Los Angeles.

January 17, 2024

Alhambra Locals Get Another Month to Review City’s Bike/Ped Plan

The release of the final plan just a few days before it was set to be adopted riled some Alhambra residents, but city officials say the sooner it’s voted on, the sooner they can seek funding

January 12, 2024

SGV Hikes and Bikes: Santa Fe Dam

Take to the elevated bikeway for a view of the Valley, or get away from it all in a pedal boat.

January 5, 2024