Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Caltrans

Metro Looks to Widen the 14 Freeway in North Los Angeles County

Last week the Metro board approved a motion that directed Metro staff to work with Caltrans "to correct sub-standard configurations" on the 14 Freeway in North L.A. County. In L.A. freeway-speak, "correcting sub-standard conditions" pretty much always means widening the freeway. The motion pretty much confirms this, noting that "the [SR-14's] sub-standard lane drop configuration creates bottlenecks." How have Metro and Caltrans dealt with lane drops and bottlenecks in the past? They have added more lanes.

Map of the southern portion of the 14 Freeway, where it runs through Santa Clarita, unicorporated L.A. County, and Palmdale. (The freeway continues north of the map, into Kern County)
Google Map of the southern portion of the 14 Freeway, where it runs through Santa Clarita, unincorporated L.A. County, Palmdale, and Lancaster. (The freeway continues north of the map, into Kern County)
false

The motion was authored by Metro Board Chair Ara Najarian, alongside Boardmembers Kathryn Barger and James Butts. In committee [minute 36], Najarian urged motion approval noting how the main problems are many locations with the 14 Freeway "going from three lanes to two, especially with a downhill and very curvy route." He called "to keep the lanes at their most optimal configuration" and he was not suggesting that the three lane sections to be reduced to two lanes.

Note that Najarian's numbers refer to just one direction - and omit existing carpool lanes. There are no curvy hilly "two lane" [four total lanes] stretches of the SR-14. (The only L.A. County stretch of "two lane" [four lane total] 14 Freeway is flat and straight, from the northern part of Lancaster to the Kern County Line.) Through Santa Clarita, and northeast of Santa Clarita to the Antelope Valley, where the 14 is hilly and curvy, the narrowest parts of the 14 Freeway are already at least three lanes wide [six-plus lanes total]; each direction has at least two general purpose lanes alongside a carpool lane.

The motion called for acting on recommendations in the 2004 North County Combined Highway Corridors Study. That study called for increased transit, multiple reversible high-occupancy lanes, and lots of "substantially increased vehicle capacity." It calls for 14 Freeway "short-range improvements" to include "elimination of lane drops with continuous 3 mixed-flow lanes and one HOV lane in each direction between Sand Canyon and Avenue P."

The distance from Sand Canyon to Avenue P is about 25 miles. The lane configuration there varies; most of it is six lanes wide, with some seven and eight lane stretches.

xxx
2020 Caltrans graphic of North County Highway projects - via NCTC. Listed fourth in the SR-14 Improvements box is "capacity improvements" estimated to be initiated Spring 2022.
false

Caltrans had indicated its plans to initiate a "capacity improvements" project on about thirteen miles of SR-14 (between Newhall Avenue and Agua Dulce Canyon Road) in 2022. About seven miles of that overlap with the short-range SR-14 widening in the 2004 report. The status of that overlapping project is unclear; it does not appear on the Caltrans District 7 current projects listing nor the California Environmental Quality Act (CEQA) database.

The motion directed Metro staff to get environmental clearance underway for three substandard locations on the 14 Freeway, utilizing $4.7 million in funding from the North County Transportation Coalition. Starting in October 2022, Metro staff will report back to the board with the status of this project.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

Thursday’s Headlines

Trump and CA head to court on EV regs...

June 26, 2025

Talking Headways Podcast: Why We Need ‘Universal Basic Mobility’

In a very special podcast, we’re joined by the great Madeline Brozen of UCLA to talk about how guaranteed transit lowers people's stress.

June 26, 2025

Study: America’s Blind Spots Are Expanding

The drivers of America's most popular cars can see less and less of the road every year — and regulators aren't stepping in.

June 25, 2025

Eyes on the Street: New L.A. River Access Path

At Griffith Park Recreation Center a nearly complete new ~750-foot river access path connects to two existing footbridges, improving access to the L.A. River and its bike/walk path.

June 25, 2025

Commentary: Advocates Just Won a Transit Funding Battle They Can’t Afford to Continually Re-Fight

Advocates for safe and livable streets need to focus on fundamental change—and that starts by putting the brakes on highway widening once and for all.

June 25, 2025

Today’s Headlines

More on the Budget. More on ICE. Lots of other news...

June 25, 2025
See all posts