Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Public Transportation

Commentary: Estuary Ferry Should Run as a Horizontal Elevator, Not a Bus

Note: GJEL Accident Attorneys regularly sponsors coverage on Streetsblog San Francisco and Streetsblog California. Unless noted in the story, GJEL Accident Attorneys is not consulted for the content or editorial direction of the sponsored content.

Motorists get four lanes in two underwater tubes to get between Jack London Square (JLS) and western Alameda. Cyclists and pedestrians get nothing*. Fortunately, Alameda is working to remedy that. From an approved proposal for a water ferry for bicyclists and pedestrians that, if fully funded, will start in September of 2023 and operate five days a week:

  • During the eight spring, summer and fall months, the service would operate for 12-13 hours each day with approximately 44 crossings a day. During the four winter months, service would be reduced to 9 hours a day and about 29 trips, enabling the longer hours during the spring, summer and early fall months, when ridership is expected to be higher.
  • Morning and evening commute services would operate between the new water shuttle dock at Alameda Landing and Jack London Square (at Broadway). Midday, lunchtime services would be provided between Jack London and Marina Village.

Alameda has committed $150,000 over two years for the pilot service, explained Rochelle Wheeler, Senior Transportation Coordinator for the city. Now her team is applying for grants from the county and others to cobble together the some $2 million it will take to get a boat running.

This is welcome news. As a resident of JLS, it's super frustrating to look across the 800-foot estuary at Target, Safeway, restaurants, and other services, with no practical way to get there without a car. Likewise, residents of western Alameda are cut off from BART, Amtrak, and downtown Oakland. It's possible to take a bus, but it requires backtracking more than 1,000 feet and crossing under the freeway.

But planners are talking about the ferry pilot as a scheduled service, akin to a bus on water. "That is what we have proposed," Wheeler told Streetsblog.

Meanwhile, the J-Mack Ferry pictured below, one of the car ferries that Caltrans provides in the Sacramento Delta Region, doesn't operate like a bus. From Caltrans:

The J-Mack Ferry crosses Steamboat Slough in the Sacramento Delta, connecting Grand Island to East Ryer Island; about a 400-foot three-minute ride. The vessel is classified as an extension of Highway 220. The J-Mack currently operates 24 hours a day, 7 days a week. Boat operators are on duty 24 hours a day to provide service to individual [emphasis added] passengers and motorists crossing Steamboat Slough.

The Real McCoy Ferry provided by Caltrans for motorists near Sacramento. Image: Wikimedia Commons
A ferry provided by Caltrans for motorists near Sacramento. Amazing how much Caltrans caters to motorists, isn't it? Image: Wikimedia Commons
false

The long-term goal of the city of Alameda is to provide a pedestrian and bicycle bridge across the estuary. That's ideal because there's no wait time or schedule to deal with. A ferry should emulate that, as the J-Mack ferry attempts to do by operating on demand. Think of it this way: there are skyscrapers that are more than 800 feet high. Nobody would run an elevator on a schedule and/or with a projection of 44 or 29 up-down trips a day. Elevators just come and go when you push the button.

Vancouver, Canada 'Aquabus' runs back and forth between Yaletown and Granville Island, and might be an inexpensive craft for Alameda to consider. Photo: Wikimedia
Vancouver, Canada 'Aquabus' runs back and forth between Yaletown and Granville Island, and might be an inexpensive craft for Alameda to consider. Photo: Wikimedia
false

Estuary ferries should run the same way. If someone is on the opposite shore from the boat, they should be able to push a virtual button (or a physical one on the dock) to call the operator over to pick them up. Or funds permitting, there should be two little boats instead of a large one, so as soon as one departs, its opposite number would cross with or without passengers, so there's always a ferry waiting or on its way. I would add that planners should choose between Marina Village or Alameda Landing (or someplace in between); having it serve one or the other at different times is just confusing.

Wheeler said the priority is getting the financing in place and starting a pilot service, with long-term operations (and the exact boat type) to be determined. But she said an on-demand, elevator-style service could end up how it's done since the cost would be the same. "We'll be paying at an hourly rate."

Streetsblog will be happy either way just to be able to get across the water. But long term, cyclists and pedestrians deserve the same kind of on-demand service that motorists get. And if we're paying for a boat and an operator anyway, why make people wait?

*Sorry, the suicide ledge in the Posey tube is as close to 'nothing' as it gets.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

New Draft CA High-Speed Rail Business Plan is LESS Costly than the 2022 Plan

Want a chance to really weigh-in on CAHSRA planning? Here's your once-every-four-years-chance.

March 3, 2026

Tuesday’s Headlines

I feel like last week I was struggling to get 8 good, solid, non jokey headlines and this week so far the headlines are stacked!

March 3, 2026

Could Refurbished E-Bikes Be the Secret Weapon of the Livable Streets Movement?

A high-quality used market could be the boost America needs to get would-be riders off the sidelines and into the saddle, a new report argues.

March 2, 2026

New UCLA Report Looks into the High Cost to Build Parking

For new apartments, the research found that building required parking adds roughly $50,000 to $100,000 per unit, and disproportionately increases the cost to build smaller apartments.

March 2, 2026

Fresno’s New Active Transportation Plan Sets an Ambitious Course — Advocates Say Execution Will Be Key – Comments Due March 5

The draft ATP paints a hopeful picture of a Fresno, but advocates worry it reads more like a consultants wish list than a plan.

March 2, 2026

Driver Kills Two-Year Old Child in Mission Rock

SFMTA responds by repainting crosswalks. But once again things are following a familiar script.

March 2, 2026
See all posts