Skip to Content
Streetsblog California home
Streetsblog California home
Log In

Podcast

Deadline For Input on SGV Greenways Implementation Plan is Saturday

The 200+ page document provides a comprehensive look at how the region’s flood control channels can be remade into walk/bike paths

April 21, 2025

Talking Headways Podcast: The Pacific Circuit

Alexis Madrigal connects containerization to globalization and its direct impacts on one Oakland neighborhood.

April 17, 2025

Talking Headways Podcast: The California State Rail Plan

This week we’re listening in on a conversation hosted by Seamless Bay Area about the 2024 update to the California State Rail Plan.

April 11, 2025

SGV Connect 135.2 – Memories of El Monte and The People’s Cafe

Last week, Chris visited the mutual aid group Memories of El Monte's bi-weekly food distribution at the Klingerman Apartment projects in South El Monte to interview group members and get an update on the construction of their physical location, The People's Cafe.

April 3, 2025

Talking Headways Podcast: Planning Connections in Panther City

Fort Worth's Kelly Porter on the city's city’s history, incredible growth and Texas high-speed rail.

April 3, 2025

SGV Connect 135.1 – An Update on the Foothill Gold Line Construction Timelines

Damien Newton sat down with Gold Line Foothill Construction Authority CEO Habib Balian to discuss how a too-high bid will lead to a delay on Gold Line construction to Montclair

April 2, 2025

Talking Headways Podcast: American Oasis

Kyle Paoletta on the growth and history of southwestern U.S. cities.

March 27, 2025

Eyes on the Street – Big Dalton Bike/Walk Path is Now Open

Not the same as the one in Baldwin Park, this multi-use path (formerly the Vincent bikeway) traverses Irwindale, Covina, Azusa, and unincorporated parts between.

March 25, 2025

Does the Media Help Create the Traffic Violence Crisis?

Which came first: the chicken (deadly driving) or the egg (a culture that normalizes it)?

March 24, 2025

Metro Tests Foothill A Line Extension, Authority Prepares to Construct Next Segment

Emergency drills are being practiced and vital systems double checked while a final price tag and start date are being worked out for Pomona to Montclair.

March 19, 2025