Skip to Content
Streetsblog California home
Streetsblog California home
Log In

Joe Linton

Metro Breaks Ground on Early Phase of Southeast Gateway Light Rail Construction

The initial $7 billion SE Gateway Line segment will extend 14.5 miles from Artesia to the South L.A. community of Florence, with connections to the Metro A and C Lines

November 1, 2024

Eyes on the Street: New San Pedro Front Street Walk/Bike Path

The half mile long landscaped multi-use path extends from Regan Street (essentially under the Vincent Thomas Bridge) to just west of Pacific Avenue

October 18, 2024

CicLAvia Heart of L.A. 2024 – Open Thread

Sunday's Heart of L.A. event was the 56th iteration of Los Angeles' popular open streets festival, CicLAvia

October 16, 2024

Eyes on the Street: Santa Monica’s New Michigan Avenue Greenway Extension

The 1/8-mile-long Michigan Avenue Neighborhood Greenway (MANGo) extension includes two short bike/walk paths and one block of two-way protected bike lanes

October 14, 2024

Advocates Push Metro and L.A. City for a More Multimodal Vermont Avenue; HLA Compliance Challenged

Metro's too-modest Vermont Avenue bus plans don't appear to comply with Measure HLA Mobility Plan requirements. It's one of at least a half-dozen Metro projects that appear to clash with HLA/MP2035.

October 4, 2024