Skip to content
Sponsored

Thanks to our advertising sponsor

San Fernando Breaks Ground on New Pacoima Wash Walk/Bike Path

The initial 1.4-mile Pacoima Wash project will extends along the east side of the wash, and includes a new bike/walk bridge, native landscaping, fencing, lighting, and watershed features.
San Fernando Breaks Ground on New Pacoima Wash Walk/Bike Path

The city of San Fernando broke ground on a new multi-use path along the Pacoima Wash. San Fernando Mayor Celeste Rodriguez proclaimed that the project’s spaces for bicycling, walking, and gathering will contribute to the community’s beauty, health, and safety.

San Fernando Mayor Celeste Rodriguez
San Fernando Mayor Celeste Rodriguez

Mayor Rodriguez and others emphasized safety improvements, including new railing and a new walk/bike bridge, recalling the tragic loss of Elias Rodriguez, a youth who drowned in the wash in 2017. Through nearly all of the urbanized San Fernando Valley, the Pacoima Wash is lined in concrete and runs fast, high, and dangerous during rain storms.

Assemblymember Luz Rivas recalled that, as a high school student, she had worked at the adjacent open air swap meet just east of the wash. Rivas was excited for those in attendance to return with their bikes when the project is completed (anticipated to be September 2024), and “enjoy the area with our families.” Rivas’s state earmark funding was instrumental in closing a gap in the project budget.

Assemblymember Luz Rivas (left) speaking at this morning's groundbreaking
Assemblymember Luz Rivas (left) speaking at this morning’s groundbreaking

The initial 1.4-mile phase of the project will extend along the east side of the Pacoima Wash between 4th Street/Bradley Avenue and the 8th Street Pacoima Wash Nature Park. Near the intersection of 8th and Newton Streets, the path will cross the wash on a new bridge. A future construction phase will extend the path northward along the park to the city limit at Foothill Boulevard.

In addition to bike and walk paths, the project includes native landscaping, fencing, lighting, and watershed features for soaking rainwater into the earth.

Pacoima Wash Vision Plan bike/walk path rendering

The path is part of a larger Pacoima Wash Vision Plan. Financing this initial phase has taken two decades, with some hiccups along the way. The city ended up pulling together funds from numerous sources for the multi-purpose project. In addition to the Rivas earmark, the budget includes funds from the state Active Transportation Program, Metro Measure R Local Return,  Federal Congestion Mitigation and Air Quality Improvement Program (CMAQ), Mobile Source Air Pollution Reduction Review Committee (MSRC), and funding from the Santa Monica Mountains Conservancy.

The concrete lined Pacoima Wash at Glenoaks Boulevard
The concrete-lined Pacoima Wash at Glenoaks Boulevard
The Pacoima Wash from Foothill Boulevard. A future phase will extend the path along the Pacoima Wash Nature Park on the right.
The Pacoima Wash from Foothill Boulevard. A future phase will extend the path along the Pacoima Wash Nature Park on the right.

Streetsblog has migrated to a new comment system. New commenters can register directly in the comments section of any article. Returning commenters: your previous comments and display name have been preserved, but you'll need to reclaim your account by clicking "Forgot your password?" on the sign-in form, entering your email, and following the verification link to set a new password — this is required because passwords could not be carried over during the migration. For questions, contact tips@streetsblog.org.

More from Streetsblog California

The Week in Short Videos

April 17, 2026

Friday’s Headlines

April 17, 2026

Mayor Gloria’s Budget Has Deep Cuts for Safety and Bicycle Program for the San Diego Department of Transportation

April 16, 2026

Thursday’s Headlines

April 16, 2026

Pasadena Adopts Most of the 710 Stub Vision Plan

April 16, 2026
See all posts