Skip to Content
Streetsblog California home
Streetsblog California home
Log In
Podcast

SGV Connect 40: Protected Bike Lanes for Pasadena and Freeway Barriers for the 210

Before we get to this week's episode of SGV Connect, let me remind you that this Thursday is Streetsblog L.A.'s annual awards dinner. We'll be honoring Active SGV, Assemblymember Laura Friedman (D-Glendale), and three other deserving people and organizations. To get tickets or find out more, click here.

Leading off today's podcast, Kris Fortin speaks with Blair Miller of the Pasadena Complete Streets Coalition to get an update on the protected bike lane proposed for Union Street in Pasadena. Unlike the planned road diet for Orange Grove Boulevard that was scrapped earlier this year, there has not been nearly the same level of opposition for this project. Miller and Fortin report that, instead, advocates for safe streets were galvanized by the NIMBY Bikelash on that project last year.

Then Damien Newton talks with Androush Danielians, Executive Officer of Project Engineering at L.A. Metro, about the I-210 Barrier Project. For more than a decade, drivers have been crashing their vehicles onto the train tracks where the Metro Gold Line train runs in the middle of the 210 Freeway through Pasadena and Arcadia. At last month's Metro Board meeting, the Board voted to move forward with a project to create barriers between the freeway and Metro property. For more coverage of this issue from Streetsblog, click here.

#SGV Connect is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the new Gold Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit Foothill Transit. “Foothill Transit. Going Good Places.”

Catch past episodes of SGV Connect and #DamienTalks on LibSyn, iTunes, Google Play, or Overcast.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

2026 Could Be the Year Everything Changes for California High-Speed Rail

What's being built. The financial plans. Everything short of the route could be different a year from now.

November 13, 2025

Why the $65M Studebaker Road Transformation Project Is important for Long Beach

When construction wraps in late 2026, the Studebaker corridor will no longer be a line of separation but a living connector.

November 13, 2025

Thursday’s Headlines

Just a reminder, SBCAL will not be publishing tomorrow.

November 13, 2025

LA Scrapes Grassroots Koreatown Crosswalks, Plans To Replace

The city will replace guerilla crosswalks with an interim traffic circle and new crosswalks. The delayed permanent traffic circle is expected to installed next year.

November 12, 2025

Call to Action: Tell Supervisor Beya Alcaraz About Your Love for Sunset Dunes

Advocates want to make sure the new District 4 Supervisor knows where you stand.

November 12, 2025
See all posts