Skip to Content
Streetsblog California home
Streetsblog California home
Log In
LA Metrolink

Ribbon Cut for New Arrow Train Service from Redlands to San Bernardino

This morning, San Bernardino County leaders celebrated a ribbon-cutting for new Arrow train service between San Bernardino and Redlands. Metrolink will operate service on the nine-mile-long line starting Monday.

Metrolink system map
Metrolink system map - new Arrow line (dashed) is in the middle right. Click for larger PDF image
false
Map of Arrow Redland Passenger Rail Project - via fact sheet
false

Arrow will operate just over twenty trips per day between Downtown San Bernardino and Redlands University. There is also one express train daily between the Downtown Redlands and L.A. Union Station (per the current schedule it departs Redlands at 5:58 a.m., then from Union Station at 5:26 p.m. - check for latest schedule at Metrolink website). At Downtown San Bernardino, Arrow riders can easily transfer to Metrolink's San Bernardino and Inland Empire-Orange County Lines, as well as San Bernardino County Transportation Authority's (SBCTA) sbX Bus Rapid Transit line.

The new train connects to job centers, including Esri, civic centers in Redlands and San Bernardino, and to the University of Redlands.

xxx
San Bernardino County Supervisor Dawn Rowe presided over the Arrow ribbon-cutting ceremony
false
xxx
Officials cut the ceremonial ribbon for new Arrow train service. Holding the big scissors is U.S. Representative Pete Aguilar
false
xxx
Arrow service operates with "DMU" (diesel multiple unit) trains. The engine is in the middle of the train, with passenger space on both ends. The middle engine unit can be swapped out to run on various energy sources - diesel, catenary electric, etc. Initial Arrow operations will be diesel, with plans to upgrade to zero-emission energy in 2024.
false
xxx
After speakers and ribbon cutting, the public lined up to check out the interior of the new Arrow train cars.
false
xxx
Interiors have numerous contemporary train features (see below). The upper middle of the photo shows the corridor through the middle engine car.
false
Arrow trains feature level boarding, wheelchair spaces, bike parking, luggage racks, USB chargers, and more
false
xx
The downtown Redlands Station features two platforms: one higher (level-boarding) for Arrow, and one for standard Metrolink trains. On the right is a new parking structure for Arrow/Metrolink riders.
false
xxx
Arrow utilizes existing rail right-of-way, most of it is single-tracked
false
Historic downtown Redlands station with the brand new Arrow train
false

More photos at SBLA Twitter.

Stay in touch

Sign up for our free newsletter

More from Streetsblog California

CA Will Continue to Undermine its Climate Goals by Widening Highways

CTC approved funding to widen I-80, and a bill that would have reformed funding for freight corridors was killed by the Appropriations Committee

May 17, 2024

Op-Ed: This ‘Bike to Work’ Day, Let’s Pass Bold Policies to Support Cyclists

"It is hard to think of another mode of transportation that is a more powerful tool to meet [our challenges.]"

May 17, 2024

Metro Committee Approves $225M Cost Overrun for Westside Subway Section 1 Construction

Wilshire subway 4-mile extension section 1 (Western to La Cienega) budget swells from from $3.14B to $3.35B. Section construction is 91 percent done, now anticipated to open fall 2025

May 17, 2024

Talking Headways Podcast: An Update to Human Transit

Jarrett Walker on the release of the revised edition of his influential book Human Transit. 

May 17, 2024
See all posts