Streetsblog’s San Gabriel Valley coverage and this newsletter is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the A Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit Foothill Transit. “Foothill Transit. Going Good Places.”
 
Getting this newsletter from a friend? Sign-up for own copy.

Foothill Transit Has New Schedules Coming Out for September 15. Click here to see if there’s changes along your route.

This Week’s Featured Post:


What’s Going On with the 57/60 Confluence Project Construction?
Construction is a year behind schedule, but work is being re-staged to recoup time. Changes are not expected to affect drivers on the freeways.
By Chris Greenspon
August 26, 2025

Top Headlines:
Foothill Gold Line Construction Newsletter for August
Report: Montclair A Line Extensions Benefits Jobs, Economy (SGV Tribune)
Take the La Puente Mixed Use Places Survey
Merced Ave. Greenway: A Blueprint for Sustainable Cities (ActiveSGV)
Pasadena Approves Hydrogen Bus Contract (Pasadena Now)
South Pasadena Secures Funding For Two Pocket Parks (So Pasadenan)
Rule Change Could Facilitate More Speed Bumps (Pasadena Now)
City To Eliminate Obsolete Bike License Requirement (Pasadena Now)
Solis Will Run for Congress if Redisctricting Happens (SGV Trib)

And here’s some Streetsblog stories from around the country from the past week:

  • La Verne Approves Protected Bike Lanes to Pomona North Metro Station
    by The Editorial Team
    April 8, 2026

    With this, the city will play a part in building safe facilities west-to-east across the entirety of its neighbor, Pomona.

    The post La Verne Approves Protected Bike Lanes to Pomona North Metro Station appeared first on Streetsblog Los Angeles.

  • Pasadena Moves Closer to Adopting 710 Stub Vision Plan
    by The Editorial Team
    April 2, 2026

    City Council shared concepts for rebuilding the community razed in the 1970s, and seemed keen on making restitution to the victims of freeway displacement.

    The post Pasadena Moves Closer to Adopting 710 Stub Vision Plan appeared first on Streetsblog Los Angeles.

  • Monrovia Seeks Input on Draft Bike Master Plan
    by Chris Greenspon
    March 24, 2026
    The deadline for public comment is this Friday, March 27 2026.
  • Pasadena Seeks Input for Transit Service Overhaul
    by Chris Greenspon
    March 17, 2026
    Several lines could be condensed on the north side of town, a new line is proposed from Huntington Hospital to JPL, and Dial-A-Ride could give same day service.
  • SGV Connect 146: What’s Next for the Foothill Gold Line Construction Authority
    by Damien Newton
    March 3, 2026
    CEO Habib Balian joins SGV Connect to discuss the A Line’s steady ridership, transit-oriented development along the corridor, and the shift to a new delivery model for the long-anticipated Claremont extension.
Donate to Streetsblog California

Copyright © 2024 SCSI Damien Newton, All rights reserved.
You are receiving this email as a friend of Streetsblog California.

Facebook Twitter
Our mailing address is:
SCSI Damien Newton 11539 National Boulevard, Los Angeles, CA 90064
Manage Subscription Preferences
LiveIntent Logo AdChoices Logo